Convert survey and model points between national grids, UTM zones and latitude/longitude by EPSG code, and get the grid convergence and scale factor at each point — in the browser.
Pick the source and target coordinate reference systems from a list of common national grids, UTM zones and geographic systems, or paste the definition of any other EPSG code. Enter or paste points and see the converted coordinates, the grid convergence (true north to grid north) and the point scale factor. Export the conversion to PDF, Word or Excel. Datum shifts are approximate and stated as such.
Open the tool on BIMpedia →