Record defects on site from your phone — location, trade, priority and a photo — move them from open to closed on a board, and export the list with photos for the contractor.
Capture each snag in seconds: location, trade, what is wrong, priority, who fixes it and a photo taken with your phone’s camera (resized in the browser). Track progress in a table, on a board (Open → In progress → Fixed, to check → Closed) or on a timeline. Export a PDF with photos for the contractor, or the list to Excel.
Open the tool on BIMpedia →