Open a Primavera P6 XER or an MS Project XML programme in your browser and read it without the planning software: the Gantt chart grouped by WBS, each activity's predecessors and successors, total float and the critical path, and a health check of the schedule (open ends, negative float, long activities, leads and lags, out-of-sequence progress).
Built for the people who receive programmes rather than write them: BIM coordinators, designers, site engineers and clients. Click any activity to see what drives it and what it drives, and walk the logic from one activity to the next. Float comes from the file when it has it, otherwise it is worked out from the logic and the file's own dates. The checks flag the things a planner would be asked about in a review, with the reason each one matters. Export the activities, links and checks to Excel, or a review report with a Gantt chart to PDF or Word. The file never leaves your computer.
Open the tool on BIMpedia →