Singapore's government built an online system for building submissions, and over two decades moved it from drawings to models, with automated checks of selected rules.
CORENET (Construction and Real Estate Network) is the Singapore government's online system for building plan submissions to its regulatory agencies. It is the longest-running public example of model-based submissions and automated code checking: an early rule-checking module from 2000, BIM submissions accepted from around 2011, and a newer platform, CORENET X, with an automated model checker that consultants can run before submitting.
Automated checking works only with published modelling rules and measurable regulations: the model must be prepared to a guide, and only rules that can be expressed clearly are checked automatically. The rest is still reviewed by people. The case also shows how long such a programme takes: two decades of steady change rather than one switch.
Read the full entry on BIMpedia →